Example · Claude Desktop and Civil 3D
Verify the storm sewer submittal.
The engineer asks Claude to compare the submitted structures with the drawing. Three tool calls follow the network down to the rim and invert of structure C1.
list_pipe_networksFive networks
- STORM A · 11 pipes, 12 structures
- STORM B · 1 pipes, 2 structures
- STORM C · 7 pipes, 8 structures
- STORM D · 6 pipes, 7 structures
- STORM CULVERTS · 4 pipes, 12 structures
get_network_structuresSTORM C
- C1 · 48 DIA MH · Rim 513.00′
- C2 · 38X45 BOX · Rim 522.21′
- C3 · 38X45 BOX · Rim 520.18′
- C4 · 24X45 TYPE M · Rim 518.21′
- C5 · 24X45 TYPE M · Rim 518.21′
- C6 · 24X45 TYPE C · Rim 518.44′
get_structure_propertiesStructure C1
STORM C · 48 DIA MH · Two connected pipes. Rim elevation 513.00′. Invert elevation 504.199′.
| Parameter | Submittal | Civil 3D | Result |
|---|---|---|---|
| C1 rim elevation | 513.00′ | 513.000′ | Match |
| C1 invert out | 504.20′ | 504.199′ | Match |
| C2 rim elevation | 522.21′ | 522.209′ | Match |
| C3 pipe 1 size | 30″ hole | 24″ pipe | 6″ clearance |
The example’s rim and invert elevations agree to within 0.01 ft. The 30-inch precast opening provides installation clearance around the 24-inch pipe.